Contractor Bid Packet for the Twisp Horseshoe Side Channel

 
Project abstract: 

***UPDATE APRIL 21, 2017: REVISIONS TO THE BID PACKET (Twisp_Horseshoe_Construction_Bid_Packet.pdf) HAVE BEEN MADE.  PLEASE DOWNLOAD AND REVIEW THE UPDATED BID PACKET DOCUMENT AT THE BOTTOM OF THIS WEBPAGE TO DEVELOP YOUR BIDS.***

The Yakama Nation’s Upper Columbia Habitat Restoration Project is requesting bids for construction of a Salmon Habitat Enhancement Project to be implemented adjacent to the Twisp River in July through September 2017.  The project will involve all work elements and specifications found in the Project Plans attached to this Request for Bids announcement. 

To create a bid for the Twisp Horseshoe Side Channel Project please download the Twisp_Horseshoe_Construction_Bid_Packet.pdf file from this webpage and follow the directions provided.  

This project has adopted by reference in the Engineer's Planset the 2014 Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge, and Municipal Construction.  Please also download a digital copy of the WSDOT_Standard_Specs_Manual-2014.pdf file from this webpage for reference when producing your bids.

Please note that bids will be due in Toppenish by Close of Business, Thursday, May 4, 2017, in hardcopy form.  Only hand deliveries and/or mail or parcel delivery service submittals will be accepted. 

If you are interested in an award for this contract please attend the only pre-bid site visit scheduled on Thursday, April 20, 2017, at 10:00 am at the project location (929 B Twisp River Rd, Twisp, WA  98856).   This site visit will be conducted by Yakama Nation Fisheries Habitat Biologist Madeleine Eckmann, who is the project manager.   

Bids should be mailed, parcel delivered, or hand delivered to:

Yakama Nation Fisheries
Attn:  Jackie Olney
RE:  Twisp Horseshoe Side Channel Project
PO Box 151
Toppenish WA, 98948
(Shipping address: 401 Fort Road, Toppenish, WA  98948)  
 

Additional Information:

  • Davis Bacon Wages apply to this contract. The winning contractor will adhere to the Davis Bacon rules and comply and submit all necessary paperwork to the Yakama Nation.
  • The Yakama Nation  is exempt from state taxes on this project. Please see the attached Treaty Fishery Exempt Cover Letter and Treaty Fishery Exempt Certificate.  The winning contractor will receive signed copies for their records.